Unosi iz tabele: vt131

idh_idstatusdatum_neispvrijemeh_vazd_neispopisuser1_iddatum_opravkeh_vazd_opravkeradoviuser2_idaktivanvrijeme2user1_vrijemeuser2_vrijemeDetalji
1724132019-03-0400:00:08807.12Pregled u tehničkom danu. 132019-03-04807.12Izvršen. 13000:00:1011:30:2411:30:44Detalji
1725132019-03-0400:00:08807.12Ručno okretanje kola turbine kompresora lijevog i desnog motora. 132019-03-04807.12Izvršeno. 13000:00:0911:31:2811:31:51Detalji
1726132019-03-0400:00:08807.12Operativna provjera posle 6 mjeseci ± 15 dana čuvanja helikoptera.132019-03-04807.15Izvršeno. 13000:00:1011:33:1811:33:46Detalji
1727232019-02-2500:00:08799.23Tehnički dan.132019-02-25799.23Izvršen.13000:00:1212:30:5312:31:16Detalji
17282232019-03-0400:00:109280.50Oil analysis results of 42 stepena gear box abnormal (water exceeds PMM limit). LAB recommendation "resample at the end of the next flight/day/cycle"262019-03-139280.50Completed26000:00:1314:21:1314:56:19Detalji
17292232019-03-0400:00:109280.50Oilanalysis results of 90 stepeni gear box abnormal (water exceeds PMM limit) LAB recommendation "resample at the end of the next flight /day/cycle"262019-03-139280.50Completed26000:00:1314:27:5614:57:12Detalji
1731232019-02-2500:00:10799.23Izvršiti trakiranje glavnog rotora.132019-03-04799.26Izvršeno trakiranje glavnog rotora.13000:00:1108:13:4614:16:13Detalji
1732232019-03-0400:00:09799.23Izvršiti tehnički dan. 132019-03-04799.23Izvršen. 13000:00:1108:16:3708:17:07Detalji
1733232019-03-0400:00:11799.23Operativna provjera nakon 6 mj. čuvanja helikoptera. 132019-03-04799.26Izvršena. 13000:00:1208:17:5308:19:04Detalji
17342232019-03-0500:00:089280.50XMSN oil reservoair and cooler, drain and service /inspect sump screen due on 9280.5 acft hrs.262019-03-129280.50Izvršena zamjena ulja u transmisiji i hladnjaku26000:00:1309:13:1614:59:13Detalji
17352232019-03-0500:00:089280.50PMD due after completion of phase maintenance inspection # 6.262019-03-119280.50Completed26000:00:1009:15:3915:00:44Detalji
17362232019-03-0500:00:109280.50MOC required for completion of phase maintenance inspection # 6.262019-04-019280.50Completed26000:00:1209:17:5010:04:23Detalji
17372232019-03-0500:00:109280.50General maintenance test flight requirer for completion of phase maintenance inspection # 6.262019-05-239283.40MTF OK!26000:00:1609:20:0611:08:00Detalji
17382222019-03-0500:00:109280.50Tail rotor vibration test equipment installed, aircraft restiricted to ground run only.262019-04-019280.50Inspect. OK! Removed test fquipment.26000:00:1109:21:4310:06:30Detalji
17392222019-03-0500:00:109280.50Main rotor vibration test equipment installed, aircraft restricted to MTF only.262019-05-249283.40Removed test eqipiment! Insp. OK!26000:00:1009:23:0111:34:33Detalji
17402222019-03-0500:00:109280.50Engine N2 vibration test equipment installed, aircraft restricted to MTF only.262019-05-249283.40Removed test eqipiment! Insp.OK!26000:00:1009:24:1911:33:43Detalji
17412232019-03-0500:00:109280.50XMSN resample due after the end of next run-up or flight due to replacement of oil.262019-03-139280.50Completed26000:00:1409:25:3415:01:48Detalji
17422912018-08-2700:00:101695.15Neispravan RPG.Na malom gasu obrtaji ostaju na 23000, a temperatura T4 ostane na 90 C, sporo raste .112020-09-141695.15Ugrađen ispravan sklop regulatora protoka goriva sa pripadajućim dijelovima.11000:00:1510:07:5415:19:42Detalji
1743932019-02-2200:00:15962.07Pregled jednosmjernih spojnica glavnog reduktora ВР-8А poslije 500 ± 50 sati rada. 132019-02-27962.07Izvršen pregled jednosmjernih spojnica glavnog reduktora prema postupku 01.VTUP-022.17.0.004.13000:00:1411:30:5511:32:51Detalji
1744912019-02-2600:00:10962.07Vlaženje ulja na spoju cjevovoda 7902.1790 i 7902.1780 za povrat ulja od II oslonca ka donjem uljnom agregatu lijevog motora.132019-02-27962.07Zamjenjena oštećena gumica 64K55-1320 na spoju cjevovoda. 13000:00:1111:55:4111:56:42Detalji